Project Performance Evaluation Reports
Project Performance Evaluation Reports (PPERs) evaluate the design, implementation, and performance of projects and programs. They are prepared about 3 years after project completion.
-
Electric Networks of Armenia CJSC Distribution Network Rehabilitation, Efficiency Improvement, and Augmentation Project (Armenia) Loan 3540
ONGOING EVALUATION. Armenia’s energy sector has undergone a series of reforms that have significantly improved its performance. The reforms involved the unbundling of a vertically integrated electricity subsector and the privatization of power and gas distribution networks and most generating companies. In particular, the Government of Armenia privatized the Armenian electric distribution networks in 2002 to the Electric Networks of Armenia CJSC (ENA). -
Jana Small Finance Bank Limited (formerly known as Janalakshmi Financial Services Limited) Debt Financing in India (Loan No. 7481)
ON GOING EVALUATION. In June 2016, the ADB Board of Directors approved a loan of up to $150 million (in rupee equivalent) to JSFB, which could take the form of either a bilateral loan or subscription to nonconvertible debentures. ADB also approved access to technical assistance (TA) of up to $250,000 under the regional Technical Assistance for Business Development and Implementation Support for Non-Sovereign Operations project. -
Loan to Minsheng Financial Leasing Co. Ltd. for the Green Transport Finance in the People’s Republic of China (Loan No. 3558/ Investment No. 7517)
ONGOING EVALUATION. In August 2017, the ADB Board of Directors approved the Green Transport Finance Project amounting to $400 million to finance the leasing or purchasing of green buses, including electric bus batteries through Minsheng Financial Leasing Co. Ltd. for Green Transport Finance in the People’s Republic of China. -
Georgia: Regional Power Transmission Enhancement Project
This report presents the findings of the project performance evaluation of the Regional Power Transmission Enhancement Project in Georgia. This evaluation was prepared 5 years after the loan closed in May 2017 and 4 years after the project completion report (PCR), which was circulated in May 2018. This allowed enough time to pass for a proper assessment of the project’s effectiveness, progress, and longterm sustainability. -
Project Performance Evaluation Report for Grant 0245-TAJ: Central Asia Regional Economic Cooperation Corridor 3 (Dushanbe-Uzbekistan Border) Improvement Project
ONGOING EVALUATION. This project performance evaluation report (PPER) will assess the Asian Development Bank’s (ADB) Central Asia Regional Economic Cooperation (CAREC) Corridor 3 (Dushanbe–Uzbekistan Border) Improvement Project (ADB Grant 0245) in the Republic of Tajikistan (the project). The project sought to support the government’s improvement of the road between Dushanbe–Uzbekistan border from 5 to 62 kilometers (kms). -
Asia Pacific Disaster Response Fund, 2009–2021
The Independent Evaluation Department was requested by Asian Development Bank (ADB) Management to evaluate its Asia Pacific Disaster Response Fund (APDRF) projects approved from 2009 (when the fund started) to 2021, to provide inputs to the Board to aid future fund replenishment decisions. -
Tajikistan: Khatlon Province Flood Risk Management Project
This report presents the findings of an independent evaluation of the Khatlon Province Flood Risk Management Project in Tajikistan, supported by the Asian Development Bank (ADB). The Khatlon Province Flood Risk Management Project was developed to reduce flood risks in Khatlon province, which embraces the Pyanj River and the Kyzylsu and Yakhsu tributaries. The project aimed to reinforce river embankments protecting the Chubek irrigation system, which serves an important irrigated area for agricultural production. -
Armenia: North-South Road Corridor Investment Program—Tranche 1
This report presents the findings of an independent evaluation of the North–South Road Corridor Investment Program (Tranche 1) in Armenia, supported by the Asian Development Bank (ADB). The project was financed by a multitranche financing facility (MFF) with a total loan amount of $500 million. The MFF aimed to improve the entire North–South Road Corridor, the 550- kilometer (km) Agarak–Kapan–Yerevan–Bavra road crossing Armenia from its southern border with Iran to its northern border with Georgia. -
Uzbekistan: Land Improvement Project
The project aimed to improve agricultural land quality and productivity in Bukhara, Kashkadarya, and Navoi provinces, covering 162,300 hectares (ha) of land experiencing severe land degradation in Uzbekistan. Overall, the evaluation assessed the project successful. The project resulted in significant reductions in soil salinity that have continued to diminish since project completion. Shallow groundwater tables have been significantly reduced, indicating that another problem, waterlogging, has been addressed. -
Lao People's Democratic Republic: Greater Mekong Subregion - Nam Theun 2 Hydroelectric Project
The Greater Mekong Subregion—Nam Theun 2 Hydroelectric Project in the Lao People’s Democratic Republic (Lao PDR) supported construction of a dam and associated hydropower generation facilities with installed capacity of 1,070 megawatts (MW) on the Nakai Plateau in the central region of Lao PDR, as well as mitigation and management of the project’s social and environmental impacts. The project aimed to help Lao PDR achieve sustainable growth and poverty reduction.