Tonga: Pacific Renewable Energy Investment Facility: Nuku’alofa Network Upgrade Project

Sovereign Project | 49450-036

The project will convert the distribution network of the Nuku'alofa with climate resilient infrastructure. The project will (i) convert the open overhead network to covered area bundled conductors, (ii) replace overhead consumer connections to underground cables, (iii) convert existing old distribution poles to climate resilient high standard poles, and (iv) replace ageing distribution switchgear. The project will target the Area 5 of the Tonga Power Limited (TPL)'s overall plan of converting all 5 areas of Nuku'alofa network.

Project Name Pacific Renewable Energy Investment Facility: Nuku’alofa Network Upgrade Project
Project Number 49450-036
Country / Economy Tonga
Project Status Approved
Project Type / Modality of Assistance Loan
Source of Funding / Amount
Grant 0868-TON: Pacific Renewable Energy Investment Facility: Nukualofa Network Upgrade Project
Concessional ordinary capital resources lending US$ 7.20 million
Strategic Agendas Environmentally sustainable growth
Inclusive economic growth
Regional integration
Drivers of Change Gender Equity and Mainstreaming
Governance and capacity development
Knowledge solutions
Partnerships
Private sector development
Sector / Subsector

Energy / Electricity transmission and distribution

Gender Equity and Mainstreaming Effective gender mainstreaming
Description The project will convert the distribution network of the Nuku'alofa with climate resilient infrastructure. The project will (i) convert the open overhead network to covered area bundled conductors, (ii) replace overhead consumer connections to underground cables, (iii) convert existing old distribution poles to climate resilient high standard poles, and (iv) replace ageing distribution switchgear. The project will target the Area 5 of the Tonga Power Limited (TPL)'s overall plan of converting all 5 areas of Nuku'alofa network.
Project Rationale and Linkage to Country/Regional Strategy The Kingdom of Tonga is a small island developing state which is susceptible to natural disasters and climate change impacts due to its geographical location and orientation. The country is therefore exposed to social and economic vulnerability impacting community livelihoods and infrastructure. The project aims to address the vulnerability of electricity network infrastructure and to reconstruct and enhance the infrastructure standards to make them disaster resilience.
Impact

Electricity supply reliability in Nuku'alofa improved.

Project Outcome
Description of Outcome

Technical power losses and climate vulnerability of the electricity network in Nuku'alofa reduced.

Progress Toward Outcome
Implementation Progress
Description of Project Outputs

Nuku'alofa electricity network system improved

Project implementation capacity and gender inclusiveness of TPL operations enhanced.

Status of Implementation Progress (Outputs, Activities, and Issues)
Geographical Location Nuku'alofa
Safeguard Categories
Environment B
Involuntary Resettlement C
Indigenous Peoples C
Summary of Environmental and Social Aspects
Environmental Aspects
Involuntary Resettlement
Indigenous Peoples
Stakeholder Communication, Participation, and Consultation
During Project Design
During Project Implementation
Responsible ADB Officer Lee, Woo Yul
Responsible ADB Department Pacific Department
Responsible ADB Division PAEN
Executing Agencies
Ministry of Finance
Timetable
Concept Clearance -
Fact Finding 28 Mar 2022 to 13 Apr 2022
MRM 12 Oct 2022
Approval 05 Dec 2022
Last Review Mission -
Last PDS Update 07 Dec 2022

Grant 0868-TON

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
05 Dec 2022 08 Dec 2022 - 30 Jun 2027 - -
Financing Plan Grant Utilization
Total (Amount in US$ million) Date ADB Others Net Percentage
Project Cost 8.20 Cumulative Contract Awards
ADB 7.20 09 Dec 2022 0.00 0.00 0%
Counterpart 1.00 Cumulative Disbursements
Cofinancing 0.00 09 Dec 2022 0.00 0.00 0%

Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.


Safeguard Documents See also: Safeguards
Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.


Evaluation Documents See also: Independent Evaluation

None currently available.


Related Publications

None currently available.


The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.

Requests for information may also be directed to the InfoUnit.

Tenders

Tender Title Type Status Posting Date Deadline
Project No. 49450-034 TON: Nuku’alofa Network Upgrade Project (OCB/NNUP05/21) Invitation for Bids Active 21 Nov 2022 31 Jan 2023
Project No. 49450-036 TON: Nuku’alofa Network Upgrade Project Invitation for Bids Closed 17 Nov 2022 13 Jan 2023

Contracts Awarded

No contracts awarded for this project were found


Procurement Plan