Kyrgyz Republic: Issyk-Kul Ring Road Improvement Project
The Issyk-Kul Ring Road Improvement Project will: (i) improve the 79-kilometer Barskoon-Karakol road, a part of the Issyk-Kul Ring Road, (ii) enhance the management of the road asset, (iii) improve road safety, and (iv) support the preparation of the climate strategy and action plan. The project derives synergies with earlier assistance and adopts a cross-sectoral approach to integrated development in the Issyk-Kul Lake area, with an integration of gender perspective.
Project Details
-
Project Officer
Erdene, Oyunchimeg
Central and West Asia Department
Request for information -
Country/Economy
Kyrgyz Republic -
Sector
- Transport
Related Projects
Project Name | Issyk-Kul Ring Road Improvement Project | ||||||||
Project Number | 56146-001 | ||||||||
Country / Economy | Kyrgyz Republic |
||||||||
Project Status | Proposed | ||||||||
Project Type / Modality of Assistance | Grant Loan |
||||||||
Source of Funding / Amount |
|
||||||||
Strategic Agendas | Environmentally sustainable growth Inclusive economic growth |
||||||||
Drivers of Change | Gender Equity and Mainstreaming Governance and capacity development |
||||||||
Sector / Subsector | Transport / Road transport (non-urban) |
||||||||
Gender Equity and Mainstreaming | Effective gender mainstreaming | ||||||||
Description | The Issyk-Kul Ring Road Improvement Project will: (i) improve the 79-kilometer Barskoon-Karakol road, a part of the Issyk-Kul Ring Road, (ii) enhance the management of the road asset, (iii) improve road safety, and (iv) support the preparation of the climate strategy and action plan. The project derives synergies with earlier assistance and adopts a cross-sectoral approach to integrated development in the Issyk-Kul Lake area, with an integration of gender perspective. | ||||||||
Project Rationale and Linkage to Country/Regional Strategy | Central Asia Regional Economic Cooperation (CAREC) road corridors 1 and 3 provide regional connectivity with other Central Asian neighboring countries, including Kazakstan and People's Republic China. The Bishkek-Torugart road (part of CAREC Corridor 1) and the Bishkek-Osh Road (part of CAREC Corridor 3) also enable a north-south connectivity within the country. In addition, the Almaty-Bishkek Economic Corridor (ABEC) is spurring economic growth and creating jobs through greater private investments, trade, and agglomeration of economic activities. Development of the Issyk-Kul Lake area, the country's most popular tourist destination, is an integral part of the ABEC. The Issyk-Kul Ring Road also represents strategic importance for livelihoods of local communities, including women and the vulnerable group, by improving their access to job opportunities and markets for their crops and livestock. Being a landlocked country, the Kyrgyz Republic heavily depends on road transport. About 95% of passengers and more than half of freight traffic are carried by road. Although there have been improvements in the road network performance, the quality of the roads continues to lag as the country ranked 113 out of 141 countries by the World Economic Forum's Global Competitiveness Index. The entire Issyk-Kul Ring Road has severely deteriorated. It has poor riding quality and a traffic capacity that does not meet the requirements of high volume of vehicles during tourist and harvest seasons, posing a safety risk. There is a lack of roadside public services such as visitor centers, public toilets, and streetlights lowering satisfaction for tourists. The government has been reconstructing the ring road using its own funds and with assistance from other development partners such as the Arab Coordination Group and European Bank for Reconstruction and Development. The road network of the country is vulnerable to the impacts of climate change and disasters triggered by natural hazards like intense rains and heat waves that cause floods, mudflows, landslides, melting road surfaces, and slope instability. As the road infrastructure is not adapted, it requires additional investments in resilience to such impacts. In 2021, the Kyrgyz Republic approved the updated Nationally Determined Contribution under Paris Agreement with an aim to reduce the greenhouse gas emission by 44% by 2030. |
||||||||
Impact | Competitiveness of the Kyrgyz Republic increased |
||||||||
Outcome | Efficient movement of people and goods on Issyk-Kul Ring Road improved |
||||||||
Outputs | Climate-resilient Barskoon-Karakol road reconstructed Road asset management system institutionalized Implementation of the national road safety action plan institutionalized Decarbonization of the road sector supported |
||||||||
Geographical Location | Nation-wide, Barskoon, Karakol |
Safeguard Categories | |
---|---|
Environment | A |
Involuntary Resettlement | A |
Indigenous Peoples | C |
Summary of Environmental and Social Aspects | |
---|---|
Environmental Aspects | |
Involuntary Resettlement | |
Indigenous Peoples | |
Stakeholder Communication, Participation, and Consultation | |
During Project Design | The main stakeholders include residents, business owners, trade and agricultural sector workers, and central and local government agencies and officials, tourists, and motorists. The primary beneficiaries are road users, including local and transit vehicle drivers and operators, will be consulted on engineering solutions, road sector reform activities, and impact mitigation measures during the project design, implementation, and evaluation stages. |
During Project Implementation | Consultations will be conducted with civil society organizations, nongovernment organizations, community-based organizations, and local governments. The consultations will cover issues such as road safety, social and environmental concerns, women's participation in economic activities. The consultations will cover issues such as road safety, social and environmental concerns, women's participation in economic activities. |
Business Opportunities | |
---|---|
Consulting Services | All consulting services will be undertaken in accordance with ADB Procurement Policy and ADB Procurement Regulations for ADB Borrowers for Goods, Works, Nonconsulting and Consulting Services (2017, as amended from time to time) and its associated project staff instructions. |
Procurement | All procurement of goods and works will be undertaken in accordance with ADB's Procurement Policy (2017, as amended from time to time) and Procurement Regulations for ADB Borrowers (2017, as amended from time to time). |
Responsible ADB Officer | Erdene, Oyunchimeg |
Responsible ADB Department | Central and West Asia Department |
Responsible ADB Division | Transport and Communications Division, CWRD |
Executing Agencies |
Ministry of Transport and Communications (formerly Ministry of Transport, Architecture, Construction and Communications) |
Timetable | |
---|---|
Concept Clearance | 14 Sep 2022 |
Fact Finding | 15 Jul 2023 to 31 Jul 2023 |
MRM | 15 Sep 2023 |
Approval | - |
Last Review Mission | - |
Last PDS Update | 20 Sep 2022 |
Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.
The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.
The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.
In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Title | Document Type | Document Date |
---|---|---|
Issyk-Kul Ring Road Improvement Project: Initial Poverty and Social Analysis | Initial Poverty and Social Analysis | Sep 2022 |
Safeguard Documents See also: Safeguards
Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.
None currently available.
Evaluation Documents See also: Independent Evaluation
None currently available.
Related Publications
None currently available.
The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.
Requests for information may also be directed to the InfoUnit.
Tenders
No tenders for this project were found.
Contracts Awarded
No contracts awarded for this project were found
Procurement Plan
None currently available.